- To transport Dcon Hollow Core into the customers sites, free space for parking the transport vehicles and the cranes must be ready.
- The storage area must have enough space to stack the products.
- Customers need to check the roof level before installing Dcon Hollow core.
- Mortar is put in Shear key and is placed steel wire mesh (wire mesh), concrete topcoat, at Strength of 210 ksc.
- Customers should spray water to find cracks on the panels before installing or pouring concrete.
- Customers should not pour all of the Topcoat concrete at any one position. especially in the middle of the Hollow Core.
Click to Request Quotation for Dcon Hollow Core